Info-Works for Lespérance Park

The redevelopment of Lespérance Park begins this fall. The work is planned in two phases:

  • Fall 2018: parking lots, community gardens, dog park, micro-soccer fields, development of the arena court and walkways
  • Spring 2019: coulée verte, playground and wading pool

For full details, visit the Redevelopment of Lespérance Park page.

The dates indicated are approximate, as certain factors, such as weather, could affect the time required to complete the work.

We understand that work of this scope will bring with it certain inconveniences, such as increased noise and dust in the area, in addition to disruptions to your daily routine. We thank you in advance for your understanding and your patience throughout the work.

Traffic

We will not close any streets during the work. Construction vehicles will access the construction site from Saint-Charles Avenue only. This is one of the streets the municipality has authorized as a truck route. The vehicles will enter the site via the existing entrance at the intersection of Mercier and Saint-Charles streets.

In this way, traffic impacts will be minimized as much as possible on residential streets.

Parking

Parking will continue to be available for people who use the recreation centre until work begins on the parking lots. We will make sure to inform you in advance before they close and recommend alternatives to you.

If you live close by, we therefore invite you to walk or bike in order to free up a few parking places. We thank you in advance for your understanding.

2019-06-21 - Re-opening of the parking lot and the community gardens
The contractor has completed the reconstruction of the recreation centre parking lot to improve safety for users. It will reopen on Friday, June 21 at 5 p.m. Some finishing work will take place over the next few weeks, which will occasionally require sections of the parking lot to be close. This work includes the installation of a charging station for electric vehicles as well as of urban furniture.

Please note that the section of the parking lot located on Oak Avenue is still closed and will reopen soon.

A minimum of 24 hours’ notice will be given prior to any closure.

Safety

When the work requires it, the construction site will be safely fenced off. We will also make sure that trucks and construction vehicles travel at low speeds.

Safety for motorists

For your safety, we advise you to always use caution in the area of the worksite. We also ask you to reduce your speed.  

Safety for pedestrians

The City of Saint-Lambert will set up increased surveillance around the worksite. Nevertheless, we strongly encourage parents to talk to their children about the potential dangers associated with such major renovations and to supervise them in the area of the worksite.

Dog park

While the spring thaw continues, to preserve the quality of the grass and to allow for some finishing work, the dog park will close on Monday, April 15. The park will reopen as soon as the work is completed and weather conditions permit. 

During this period, dog owners are invited to visit the Seaway Park dog run. See the Dog run page for details. We thank you for your understanding.

2019-07-17 - Dog park reopens 

The dog park will reopen on Thursday, July 18. You can once again let your pet run free in this space. However, occasional closures should be expected in the coming weeks due to the installation of a drinking fountain. We will provide as much advance notice as possible. 

To ensure that the dog park remains pleasant and safe, pet owners are encouraged to respect the rules that can be found on the “Dog runs” page. We thank you for your understanding.

Community gardens

Work on the community gardens are completed. 

Questions on the worksite?

Contact the Engineering Management division at genie@saint-lambert.ca or at 450 466-3094.

Stay informed!

We invite you to consult this page regularly. We will post frequent updates, including photos throughout the various stages of the project, which will allow you to follow the progress of the work.

News

2019-08-28 - Reopening of the children’s play area!

Great news for kids: the children’s play area in Lespérance Park will reopen on Thursday, August 29. 

Several improvements to the playground have made it safer and more enjoyable for users in addition to optimizing its various functionalities. Youngsters can now enjoy hours of fun in a new, updated play area!

Finishing work on the Lespérance Park wading pool and the Coulée verte along with the installation of water fountains will be completed in September.

2019-07-23 – Work on the community garden
The contractor will be installing furniture in the community garden at Lespérance Park this Thursday, July 25, from 7 a.m. to 6 p.m.  

To facilitate the work, the community garden will not be accessible during that time. Also, for safety reasons, the part of the parking lot opposite the garden will be temporarily closed to traffic during the installation. Thank you for your understanding. 

2019-07-18 - Work in the parking lot
The contractor will install an electric vehicle charging station in the parking lot of the recreation centre on Friday, July 19.

To ensure that the work can be done properly, it is important that motorists respect the parking restrictions in the spaces concerned. In addition, a portion of the parking lot may be temporarily closed to traffic during installation if the contractor deems it necessary for safety reasons.

2019-07-17 - Dog park reopens 
The dog park will reopen on Thursday, July 18. You can once again let your pet run free in this space. However, occasional closures should be expected in the coming weeks due to the installation of a drinking fountain. We will provide as much advance notice as possible. 

To ensure that the dog park remains pleasant and safe, pet owners are encouraged to respect the rules that can be found on the “Dog runs” page. We thank you for your understanding.


2019-06-28 - Reopening of the parking lot

The contractor has completed the reconstruction of the recreation centre parking lot to improve safety for users, and it has now reopened. It has a new, more functional configuration, with as much space as possible for greenery.

The parking restrictions on Lespérance Street and Oak Avenue have returned to normal to ensure better traffic flow on these narrow streets, and two-way traffic has been reinstated on Oak Avenue. 

2019-06-21 - Re-opening of the parking lot and the community gardens
The contractor has completed the reconstruction of the recreation centre parking lot to improve safety for users. It will reopen on Friday, June 21 at 5 p.m. Some finishing work will take place over the next few weeks, which will occasionally require sections of the parking lot to be close. This work includes the installation of a charging station for electric vehicles as well as of urban furniture. Please note that the section of the parking lot located on Oak Avenue is still closed and will reopen soon.

Community gardens
Work on the community gardens has also been completed, and it will also be open for gardeners on Friday, June 21 at 5 p.m. Some finishing touches, including the installation of raised beds and of the shed, will take place in the coming weeks, which will result in short-term closures.

 A minimum of 24 hours’ notice will be given prior to any closure.

Some ongoing work 
Work on the dog park, children’s playground and coulée verte will continue through the summer.

2019-06-07 - Closing of the Lespérance Park tennis courts parking
Starting Monday, June 10, the parking lot adjacent to the Lespérance Park tennis courts will be closed to allow the contractor to safely carry out the work in the children’s play area. It will remain closed for the duration of the work. Temporary signage will be put in place to clearly indicate this change. 

2019-05-30 - The children’s play area is getting a makeover!
Work on the Lespérance Park playground and wading pool will begin during the week of June 3 and is expected to take several weeks to complete. For safety reasons, the children’s play area will be completely closed for the duration of the work.

The improvements being made to the playground and wading pool will not only make these spaces safer and more enjoyable for users but will also optimize their various functionalities. Youngsters can look forward to hours of fun in this modernized play area!

During the summer, residents will still be able to enjoy the municipality’s many other parks and bring their little ones for a dip in the Preville Park, Seaway Park and Alexandra Park wading pools.

Parking on Lespérance Street
In addition, starting the week of June 3, to allow the contractor easy access to the children’s play area (playground and wading pool), parking on Lespérance Street, between Walnut and Curzon avenues, will also not be permitted. Temporary signage will be put in place to clearly indicate this change.

2019-05-30 - Finalization of sidewalks
As part of the rehabilitation work at Lespérance Park, the contractor will seal the sidewalk joints on Thursday, May 30. Once the sealant has been applied, it will take 24 hours before it is completely dry.

The City of Saint-Lambert is therefore asking residents not to use the sidewalks around the recreation centre until Friday, May 31. We invite you to walk over the grass to get to the building. Thank you for your collaboration!

2019-04-17 - Closing of the recreation centre parking lot
As part of the Lespérance Park redevelopment project, the City will complete the rebuilding of the recreation centre parking lot (600 Oak Avenue). As a result, starting Tuesday, April 23, it will be completely closed for a few weeks.

Alternative parking spaces will be provided during the work. We thank you for your collaboration!

2019-04-12 - Temporary closure of the dog park
While the spring thaw continues, to preserve the quality of the grass and to allow for some finishing work, the dog park will close on Monday, April 15. The park will reopen as soon as the work is completed and weather conditions permit. 

During this period, dog owners are invited to visit the Seaway Park dog run. See the Dog run page for details. We thank you for your understanding.

2019-02-27 - Reopening of the recreation centre parking lot 
The work is already finished. The recreation centre parking lot is now reopened.

2019-02-26 - Closing of the recreation centre parking lot
Good news for people who use the recreation centre! The City of Saint-Lambert is going to level the ground of the parking lot to make it safer and to promote water drainage. To allow the work to be completed, the parking lot will be temporarily closed from midnight tonight until Thursday, February 28 at 7 a.m. In the meantime, residents are invited to park on nearby streets or in the parking lot next to the Lespérance Park tennis courts. We thank you for your cooperation.

Work to finalize the reconstruction of the parking lot will continue in the spring as soon as weather conditions permit.

2019-02-06 - Reopening of the recreation centre parking lot 
The work is already finished. The recreation centre parking lot is now reopened.

2019-02-05 - Closing of the recreation centre parking lot
Good news for people who use the recreation centre! The City of Saint-Lambert is going to level the ground of the parking lot to make it safer and to promote water drainage. To allow the work to be completed, the parking lot will be temporarily closed from midnight tonight until Thursday, February 7 at 7 a.m. In the meantime, residents are invited to park on nearby streets or in the parking lot next to the Lespérance Park tennis courts. We thank you for your cooperation.

Work to finalize the reconstruction of the parking lot will continue in the spring as soon as weather conditions permit.

2018-12-19 - Reopening of the dog park
Following the completion of redevelopment of the Lespérance Park dog park, it has been reopened. Some finishing work will take place in the spring. 

We would like to take this opportunity to remind dog owners that they must keep their pets on a leash until they arrive in the dog park. We thank them in advance for their collaboration.

2018-12-07 - Reopening of the recreation centre parking lot 
The contractor has finished preparing the recreation centre parking lot to make it safe for users. The parking lot is therefore open once more. Work will continue in the spring as soon as weather conditions permit.

In the meantime, one-way traffic will be maintained on Oak Avenue. Parking bans on Lespérance Street and Oak Avenue will be restored as normal to ensure a better flow traffic on these narrow streets. 

2018-11-06 - Closure of the recreation centre parking lot extended
The poor weather conditions over the past few weeks have caused a delay in the reconstruction of the parking lot at recreation centre, which was originally scheduled to be completed by the end of October. Every effort is being made to open the parking lot within a few weeks. In addition, to speed up the completion of the parking lot reconstruction, the contractor will be carrying out work on curbs and sidewalks at and near the recreation centre this Saturday, November 10. Thank you for your patience and understanding!

In the meantime, the City is inviting residents to park their vehicles on Oak Avenue and Lespérance Street. To allow parking on both sides of Oak Avenue, it has been turned into one-way street between Mercier and Lespérance Streets for the duration of the work. People who use the recreation centre can also use the parking lot next to the tennis courts, located behind the recreation centre, and also the railway station parking lot in the evenings and on weekends. We will keep you posted on the progress of the project. 

2018-08-28 - Closing of the recreation centre parking lot
As part of the Lespérance Park redevelopment project, the City will rebuild the recreation centre parking lot (600 Oak Avenue). As a result, starting Tuesday, October 2, it will be completely closed for a period of about three to four weeks. 

Alternative parking spaces will be provided during the work. We thank you for your collaboration!

Travaux stationnement CDL

2018-09-14 | Team at work
Work began at Parc Lespérance. Already, the team is at work in the development of trails.

Work at Lespérance Park

2018-09-12 | Groundbreaking ceremony
Mayor Pierre Brodeur turned the first sod this morning at Parc Lespérance thus launching the redevelopment work. For the occasion, he was surrounded by Éric Painchaud, director of engineering, Michel Barbier, director of recreation, sports and community life, and Georges Pichet, general manager, who participate directly in the realization of this major project.

Première pelletée de terre pour le parc Lespérance

2018-09-10 | Start of work
Work on the redevelopment of Lespérance Park is slated to begin on Wednesday, September 12. For all information on this project or to follow the progress of the work, consult the Info-Works page regularly. 

We thank you for your cooperation throughout the project.